Standardization in the field of site selection planning, design (i.e., pre-feasibility study and feasibility study), construction and management for SHP plants development up to 30 MW.

Standardization of:

  • professional technical terms and definitions commonly used for SHP plants;
  • technical requirements, methodology and procedure relating to site selection planning of SHP plants;
  • technical requirements for the design (i.e. pre-feasibility study and feasibility study) of SHP plants, mainly including hydrology, geology, energy calculations, project layout, hydraulics, electromechanical equipment selection, construction planning, project cost estimates, economic appraisal, social and environmental assessments;
  • construction of SHP plants mainly including civil works, hydro mechanical structures and installation of electromechanical equipment;
  • project acceptance, renovation, operation and maintenance of SHP plants.

Excluded:

  • Standardization of electromechanical equipment for SHP plants covered by IEC/TC 4, IEC/TC 14, IEC/TC 17, IEC/TC 22 and IEC/TC 57, etc.
  • Standardization of marine energy conversion systems covered by IEC/TC114
"

Liens utiles

3

Normes ISO publiées *

1

Projet de norme ISO *

13
Membres participants
17
Membres observateurs

* ce nombre inclut les mises à jour

Comités en liaison vers le ISO/TC 339

Les Comités ci-dessous peuvent accéder aux documents du ISO/TC 339:

 

Comités en liaison depuis le ISO/TC 339

ISO/TC 339 peut accéder aux documents des Comités ci-dessous :

 

Organisations en liaison (Catégories A et B)

ISO/TC 339 - Secrétariat

SAC (Chine)

Standardization Administration of China
No. 9 Madian Donglu, Haidian District
Beijing 100088
Chine

Tel: +8610 8226 2644
Fax: +8610 8226 0660