ISO 21725-2:2021
p
ISO 21725-2:2021
71513

Abstract  Preview

This document provides information to perform the design of the prestressed concrete box girder bridge for road that complies with the limitations established in 6.1. The rules of design as set forth in the document are simplifications of more elaborate requirements. Among several erection methods of box girder bridges, the provisions of this document are mainly applicable to full staging method (FSM).

Designs and details for new road bridges address structural integrity by considering the following:

—    the use of continuity and redundancy to provide one or more alternate paths;

—    structural members and bearing seat widths that are resistant to damage or instability; and

—    external protection systems to minimize the effects of reasonably conceived severe loads.


General information 

  •  :  Published
     : 2021-11
  •  : 1
     : 83
  •  : ISO/TC 71/SC 5 Simplified design standard for concrete structures
  •  :
    93.040 Bridge construction
    91.080.40 Concrete structures

Buy this standard

en
Format Language
std 1 198 PDF + ePub
std 2 198 Paper
  • CHF198

Got a question?

Check out our FAQs

Customer care
+41 22 749 08 88

Opening hours:
Monday to Friday - 09:00-12:00, 14:00-17:00 (UTC+1)

Keep up to date with ISO

Sign up to our newsletter for the latest news, views and product information.