International Standard
ISO 4917-6:2024
Design of nuclear power plants against seismic events — Part 6: Post-seismic measures
Reference number
ISO 4917-6:2024
Edition 1
2024-02
International Standard
Read sample
ISO 4917-6:2024
80517
Published (Edition 1, 2024)

ISO 4917-6:2024

ISO 4917-6:2024
80517
Language
Format
CHF 63
Convert Swiss francs (CHF) to your currency

Abstract

This document applies to nuclear power plants with water cooled reactors.

This document does not apply to earthquakes stronger than the design basis earthquake.

This document specifies guidance on the actions to be taken in preparation for and following an earthquake at a nuclear power plant. This document is intended to be used as a guideline for decision making regarding continued operation, shutdown and restart of the nuclear power plant after an earthquake. It can also be used to assist operating organizations in the preparation and implementation of an overall pre- and post-earthquake action programme for dealing with situations in accordance with the level of seismic ground motion experienced at the site, and the seismic design level of the plant.

General information

  •  : Published
     : 2024-02
    : International Standard published [60.60]
  •  : 1
     : 12
  • ISO/TC 85/SC 6
  • RSS updates

Got a question?

Check out our Help and Support

Check out our FAQs

Customer care
+41 22 749 08 88

Opening hours:
Monday to Friday - 09:00-12:00, 14:00-17:00 (UTC+1)