Filter :
Standard and/or project | Stage | TC |
---|---|---|
Process diagrams for power plants — Part 1: Specification for diagrams |
90.93 | ISO/TC 10/SC 10 |
Process diagrams for power plants — Part 2: Graphical symbols |
90.93 | ISO/TC 10/SC 10 |
Gas turbine combined cycle power plants — Thermal performance tests |
90.93 | ISO/TC 192 |
Corrosion control engineering life cycle in fossil fuel power plants — General requirements |
60.60 | ISO/TC 156/SC 1 |
Smart community infrastructure — Electric power infrastructure — Measurement methods for the quality of thermal power infrastructure and requirements for plant operations and management |
60.60 | ISO/TC 268/SC 1 |
Technical guidelines for the evaluation of energy savings of thermal power plants |
60.60 | ISO/TC 301 |
No matching records found. Please try changing the filter settings.