Filter :
Standard and/or project under the direct responsibility of ISO/TC 67/SC 9 Secretariat | Stage | ICS |
---|---|---|
Installations and equipment for LNG — LNG railcar applications |
30.60 | |
Method to calculate GHG emissions at LNG plant |
60.60 | |
Guidance on performing risk assessment in the design of onshore LNG installations including the ship/shore interface |
95.99 | |
Guidance on performing risk assessment in the design of onshore LNG installations including the ship/shore interface |
60.60 | |
Petroleum and natural gas industries — Characteristics of LNG, influencing the design, and material selection |
90.93 | |
Installation and equipment for liquefied natural gas — Design and testing of marine transfer systems — Part 2: Design and testing of transfer hoses |
40.00 | |
Petroleum and natural gas industries — Design and testing of LNG marine transfer arms for conventional onshore terminals |
90.93 | |
Petroleum and natural gas industries — Guidelines for the marine interfaces of hybrid LNG terminals |
90.93 | |
Guidelines for systems and installations for supply of LNG as fuel to ships |
95.99 | |
Guidelines for safety and risk assessment of LNG fuel bunkering operations |
60.60 | |
Determination of the resistance to cryogenic spillage of insulation materials — Part 1: Liquid phase |
90.93 | |
Determination of the resistance to cryogenic spill of insulation materials — Part 2: Vapour exposure |
60.60 | |
Determination of the resistance to cryogenic spillage of insulation materials — Part 3: Jet release |
60.60 | |
Installation and equipment for liquefied natural gas — Design of floating LNG installations — Part 1: General requirements |
60.60 | |
Installation and equipment for liquefied natural gas — Design of floating LNG installations — Part 2: Specific FSRU issues |
60.60 | |
Petroleum and natural gas industries — Installation and equipment for liquefied natural gas — Ship-to-shore interface and port operations |
90.93 |
No matching records found. Please try changing the filter settings.